Last week Tim screwed the top plate onto the facia.
I don't like heights so he said he would do it for me.
The extension ladder isn't long enough so I set him up using a series of ladders.
First I had him use the step ladder to get into my tractor's bucket.
Then he could extend the ladder to reach where he had to go.
It worked.
I had Iron Horse excavation come past to raise the elevation of the entrance.
I was tired of walking up a 2 x 12 just to get into the house.
We've been doing that since last January.
This is nice.
Instead of brushing the inside logs with varnish Ruth and Carrie
decided to spray the finish on.
It turned clear as it dried.
They spent the better part of an afternoon doing this.
They got a system going for them.
One sprays and the other follows with a brush to remove any runs.
It's looking beautiful.
Now I have Tim on the other side of the house putting up the final trim boards.
We need to have a hard driveway to get occupency.
Something about firetrucks can't drive on steep gravel driveways.
Iron Horse put 2 dump truck loads of asphalt millings down
and then rolled it for about two hours.
To be sure the millings bonded together I first poured on 20 gallons
of my magic liquid using a watering can.
It bonded up beautifully and we passed the city's driveway inspection.
That's one inspection out of the way.
Carrie is designing and building the kitchen lights out of 12 foot steel beams.
I picked them up last Thursday and as I was unloading them Ruth asked me if they were heavy.
Before I could answer her one of them fell on my finger.
Needless to say she didn't need to repeat the question.
The air was pretty blue for a few minutes.
I thought I had broken my finger.
This picture was taken 3 days later. Still Purple.
Man, Did that ever hurt. Still does.
Saturday and Sunday were big days.
I don't like heights and the Log Guy's know it.
They offered to install the high windows.
Thank goodness.
We slid them into place from the inside.
The cross board is there to prevent us from pushing them out too far .
My idea.
I helped John lift them up into place from the inside.
The heights on the inside don't bother me.
End of the day
We've cleaned up the basement and the house to get ready for the Framing inspection.
This is the big one. I've been having trouble sleeping because of it.
WE PASSED FRAMING INSPECTION MONDAY AFTERNOON.
YAHOO.
This little cabin is starting to look great.
I'm quite proud of how it has come together.
This next week we will get plumbing and electrical inspection.
Then the insulators come in and do their magic.
Once we pass that inspection we can button it up
and go for occupancy.
Hopefully that will happen by mid November.